24 3/4'' Class 300# Steamtraps have left our factory and been prepared for deployment on the Valhall PWP-platform. These have been thoroughly prepared, tested, and inspected to meet the customer's technical, documentation, and testing requirements.

Here at Valnor, we have been part of the entire process, from the initial inquiry to the pre-production meeting at the factory, documentation handling, FAT, and several quality controls.